From Prototype

06. Wire

Make the system the normal path.

← PreviousStage 06 of 06Next →
STAGE 06

Make the system the normal path.

Finish design-system coverage so the system can be leaned on, then connect the real product flows required by the product plan. Coverage reaches 100% only when every checklist row is honestly resolved for this track.

Complete when

Coverage is complete for the design-system six; split/leftover/later/not-in-the-app filters no longer mask unresolved design-system work; the product can build through the system by default.

Not done if

Checking Wire off while coverage is incomplete; creating a second Wire sub-stage; turning Engineering Foundation into another Wire beat or Stage 7.

Evidence before advancement

  • Review the whole product scope relevant to this stage, not a hand-picked sample.
  • Compare the stage’s stated job with what changed in files, behavior, documentation, and coverage.
  • If the evidence falls short, keep the product on this stage rather than advancing the tracker.
  • Do not start the next stage’s work merely because the next step is obvious.

Keep the two clocks separate.

The From Prototype stage tracker says which job the product is doing now. Coverage says what portions of the design system are actually resolved. Stage movement is not permission to relabel unresolved coverage.